Harvard CHAO Center

Project Details

Ground up construction consisting of innovative classrooms, cafeteria & common spaces

Project consisted of engineered LGMF, sheathing, roof & window blocking for a complete exterior package and nonstructural metal framing, interior wood blocking for wall hung equipment, GWB installation & traditional joint compound finishing to complete the interior space. Common areas included high finishes and GRG shapes.

NSMC (Northshore Medical Center)

Project Details

ED/ Beds Building: Construction of a new 4 story Emergency Department/ Inpatient Beds addition.

Spaulding Renovation: 5 story renovation to accommodate new pediatric, geriatric and adult psychiatric units. The first floor will also be renovated to include a portion of the new emergency department & support spaces.
Project consisted of engineered LGMF, nonstructural interior metal framing, wood blocking as required for wall hung equipment, GWB installation & traditional joint compound finishing. A STO DEFS system was also installed at several locations at the exterior of the new/ existing structures.

Parcel L1 Seaport

Project Details

Ground up 18 story high rise shell construction consisting of engineered LGMF, sheathing, roof & window blocking for a complete exterior system and nonstructural metal framing, interior wood blocking for wall hung equipment, GWB installation & traditional joint compound finishing to complete the interior shell space. Common lobby on the first floor was a complete fit -out including extensive GRG custom ceiling panels & high-end finishes

BMC Menino IPD

Project Details

Boston Medical Center Menino Inpatient Addition and Renovation consisted of a 100,000 Sf addition as well as 170,000 Sf renovation of active hospital leaving the hospital fully operational. The project consisted of 36 major phases with added mini phases. Sweeney Drywall scope included Layout, Exterior Framing, Exterior sheathing, Roof blocking, Door Frames, Interior metal stud framing, ln wall blocking, Drywall,Taping, Single Source firestopping, EIFS, F&I Insulated Metal Panels, lnterior & Exterior,Clean Room Panels,MRICopJ:,erParelirgLeadLinedDyvvall,smallareasof ACTand F& I Doors and hardware. The BMC Menino Project was an IPD contract where Sweeney worked hand and hand with Hospital, General Contractor, Architect, and other trade partners on a daily basis to ensure the hospitals needs in a cost-effective manner .

BC Rec Center

Project Details

Sweeney had an extensive package at the new Recreational Center centered on Boston College’s Campus. Sweeney’s scope included Exterior framing, sheathing, prefabricated roof trusses, as well as interior finishes . This building was designed to match the current architecture of the BC campus and does so with its facade which Sweeney created the shell for. The inside includes Basketball, Tennis, Squash/Racquetball courts, Jogging tracks, Climbing Rock Wall and an indoor pool.

Billerica High School

Project Details

Sweeney worked with a great Shawmut team to complete a new High School adjacent to the existing High School. Sweeney’s scope included Exterior framing and sheathing, interior framing, blocking, insulation, drywall and finishes. Sweeney also installed specialty items including expansion joints, FRP and firestopping. The highlight of this project was undoubtedly the Auditorium which was an exciting challenge with accordion drywall walls and ceilings.

Soldiers Field Phase 1

Project Details

Sweeney performed a full renovation of the interior apartments and common spaces to include the following: Layout, metal stud framing, Drywall, Taping and installed the Metal door frames. This project also required Engineered LGMF drawings and structural framing for new Canopy’s.

Soldiers Field Phase 2

Project Details

Sweeney performed a full renovation of the interior apartments and common spaces to include the following: Layout, metal stud framing, Drywall, Taping and installed the Metal door frames. This project also required Engineered LGMF drawings and structural framing for new Canopy’s.

MIT W70 House

Project Details

Sweeney performed a full renovation of the interior space to include the following. Layout, metal stud framing, Drywall, Taping and installed the door frames, doors and hardware. This project also required Engineered LGMF drawings and exterior wall framing/sheathing for a penthouse and electrical room addition.

Bentley University Jennison Hall

Project Details

Sweeney performed a full renovation of the interior Lab/classroom space to include the following.
Layout, metal stud framing, Drywall, Taping and installed the Metal door frames. This project also required Engineered LGMF drawings and structural framing for new stair/platforms.