MIT W70 House

Project Details

Sweeney performed a full renovation of the interior space to include the following. Layout, metal stud framing, Drywall, Taping and installed the door frames, doors and hardware. This project also required Engineered LGMF drawings and exterior wall framing/sheathing for a penthouse and electrical room addition.