Soldiers Field Phase 2

Project Details

Sweeney performed a full renovation of the interior apartments and common spaces to include the following: Layout, metal stud framing, Drywall, Taping and installed the Metal door frames. This project also required Engineered LGMF drawings and structural framing for new Canopy’s.